Enter data in the highlighted fields
indicate the amount of the selected currency without VAT
Country of implementation of the Project
City of implementation of the object
Name of the property
Select currency for payment
Select the currency in which you prefer to receive payment
Exchange rate
UAH/EUR
Profit tax
%
VAT
%
Select fuel type
Select the type of organic fuel used for gasification. When choosing fuel - wood chips + hazardous waste, waste is taken into account with a zero price.
Net calorific value
kcal/kg
MJ/kg
Raw fuel composition
Bulk mass of fuel
kg/m3
Humidity of selected fuel
%
Select the type of cogeneration module used
Characteristics of the selected condensing module
Electric power
kW el.
Thermal power
kW heat
Efficiency el.
Thermal efficiency
Generator gas consumption
Nm3/hour
In natural gas energy
Nm3/hour
Selection of power of CHPP EC
Total modules
Kits
Electric power
kW el.
Thermal power
kW heat
Producer gas consumption at CHPP
Nm3/hour
In natural gas energy
Nm3/hour
Average loading power of the CHPP during the annual operation of the EC
%
Gasifier type used
Estimated number of sets
When using the resulting generator gas not only for combined hydroelectric power plants, but also for other technical needs or external sales, it is possible to increase the number of sets of gasifiers used
Generator gas production volume
Nm3/hour
Net calorific value of gaz
kcal/nm3
Gasification efficiency
Free generator gas for use or sale
Nm3/hour
In natural gas energy
Nm3/hour
Reduce gas sales volume
%
The gasifiers of the Energy Center operate only to produce generator gas for the combined hydroelectric power station, please mark if YES
Consumption of selected fuel per hour
t/hour
Consumption of selected fuel per year
t/year
EC operating hours per year
hour/year
Cost of the selected fuel type
UAH/t
Average employee salary
EUR/month
Cost of renting the EC site
UAH/м2
Price of electricity for EC's own needs
UAH/kWh
Electricity sales price (according to the selected 1/2/3-zone tariff)
UAH/kWh
Thermal energy sales price
UAH/Gcal
Period of commercial use of thermal energy, % of the Energy Center’s operation
%
Current price of natural gas
UAH/thous.nm3
Discount on sales of surplus generator gas in terms of natural gas
%
Return on Investment Share
%
Project loan term
When setting '0' years of lending, the calculation switches to the mode of taking into account the share of return on investment, taking into account the price of these return funds
year
Annual interest rate
%
View an example of reporting for the selected Energy Plant
SeeLeave your questions and additions to the information you filled out on the Energy Plant
Send your message and our manager will call you back as soon as possible